Calculates how much concrete a slab, strip footing, round column or post hole, round slab or set of stairs needs, in cubic yards, cubic feet and cubic meters, and how many pre-mixed bags that is. Use it before ordering ready-mix or buying bags.

How to use

  1. Under "Units", choose "ft / in" or "m / cm / mm".
  2. Choose a "Shape" and enter its dimensions and "How many". Use "Add another pour" for more parts, and switch on "Subtract this" for an opening that is left empty.
  3. Set "Extra for waste and spillage" (10% by default) to see "Concrete needed, including extra".
  4. The bag table shows how many 40, 50, 60 or 80 lb bags are needed. For another product, enter "Your bag's yield" from the bag.

How it works

Questions and answers

How many cubic yards for a 10x10 slab 4 inches thick?
10 ft × 10 ft × 4/12 ft = 33.3 cubic feet, which is about 1.23 cubic yards before any extra.
How much extra concrete should I order?
5 to 10 percent is common. Add more if the ground is uneven or the forms may bulge. Change it in "Extra for waste and spillage".
How many 80 lb bags of concrete are in a yard?
One cubic yard is 27 cubic feet. With 0.60 cubic feet per 80 lb bag, that is 45 bags before extra for waste.
Can I add several post holes at once?
Yes. Choose "Round column or post hole" and enter the diameter, the depth and "How many" to get the total for all holes.